TLP meaning in Business ?

Business Miscellaneous in Business . 2 months ago

  220   0   0   0   0 tuteeHUB earn credit +10 pts

5 Star Rating 1 Rating
What is Tension Leg Platform mean?

A tension-leg platform (TLP) or extended tension leg platform (ETLP) is a vertically moored floating structure normally used for the offshore production of oil or gas, and is particularly suited for water depths greater than 300 metres (about 1000 ft) and less than 1500 metres (about 4900 ft). Use of tension-leg platforms has also been proposed for offshore wind turbines.

The platform is permanently moored by means of tethers or tendons grouped at each of the structure's corners. A group of tethers is called a tension leg. A feature of the design of the tethers is that they have relatively high axial stiffness (low elasticity), such that virtually all vertical motion of the platform is eliminated. This allows the platform to have the production wellheads on deck (connected directly to the subsea wells by rigid risers), instead of on the seafloor. This allows a simpler well completion and gives better control over the production from the oil or gas reservoir, and easier access for downhole intervention operations.

TLPs have been in use since the early 1980s. The first tension leg platform was built for Conoco's Hutton field in the North Sea in the early 1980s. The hull was built in the dry-dock at Highland Fabricator's Nigg yard in the north of Scotland, with the deck section built nearby at McDermott's yard at Ardersier. The two parts were mated in the Moray Firth in 1984.

The Hutton TLP was originally designed for a service life of 25 years in Nord Sea depth of 100 to 1000 metres. It had 16 tension legs. Its weight varied between 46,500 and 55,000 tons when moored to the seabed, but up to 61,580 tons when floating freely. The total area of its living quarters was about 3,500 square metres and accommodated over a 100 cabins though only 40 people were necessary to maintain the structure in place.

The hull of the Hutton TLP has been separated from the topsides. Topsides have been redeployed to the Prirazlomnoye field in the Barents Sea, while the hull was reportedly sold to a project in the Gulf of Mexico (although the hull has been moored in Cromarty Firth since 2009).

Larger TLPs will normally have a full drilling rig on the platform with which to drill and intervene on the wells. The smaller TLPs may have a workover rig, or in a few cases no production wellheads located on the platform at all.

The deepest (E)TLPs measured from the sea floor to the surface are:

5,185 ft (1,580 m) Big Foot ETLP4,674 ft (1,425 m) Magnolia ETLP. Its total height is some 5,000 feet (1,500 m).4,300 ft (1,300 m) Marco Polo TLP4,250 ft (1,300 m) Neptune TLP3,863 ft (1,177 m) Kizomba A TLP3,800 ft (1,200 m) Ursa TLP. Its height above surface is 485 ft (148 m) making a total height of 4,285 ft (1,306 m).3,350 ft (1,020 m) Allegheny TLP3,300 ft (1,000 m) W. Seno A TLP reference
Full Form Category
Transient Lunar Phenomenon Academic & Science
The Lunascan Project Academic & Science
Technical Language Processing Academic & Science
Tumolbil Airport Code
Tension Leg Platform Business
The Learning Place Business
The Lowest Prices Business
Tailored Label Products Business
Teacher Leadership Project Community
Technology and Learning Program Community
The Liberian Post Community
Timber Lake Playhouse Community
The Listening Program Community
Three Little Pigs Community
Tactical Leadership Programme Community
Teen Leadership Program Community
Tata Leadership Practices Community
Tongue Lip Press Community
Teacher Licensure Program Community
Test Level Point Computer and Networking
Technology Leaders Program Computing
Transaction Layer Protocol Computing
Traffic Light Protocol Computing
Timeline Project File Type
The Last Pures General
Teen Living Programs General
Transitional Living Program General
Traffic Lightweight Protocol General
Top Level Project General
Troy Larger Parish General
Transactional License Program General
The Leon Project General
Tenerife Lan Party General
Tail Loss Probe General
Thaumatin Like Protein General
Thermal Label Printer General
Truck Loading Point General
The List Project General
Transient Lunar Phenomena General
Transitional Living Programs General
Troop Leading Proceedures General
Task Level Parallelism General
Tail Lamp Assembly General
Thin Layer Perfluorocarbon General
Transaction Layer Packet General
Troop Leading Procedures General
The Lawful Path Governmental
Trust Legal Provisions Governmental
Target Licensed Practitioner Jobs
Therapeutic Learning Program Medical
Tumor Liberated Protein Medical
Tube Launched Projectile Military and Defence
Tactical Leadership Program Military and Defence
Thread Level Parallelism Physics Related
Tumolbil, Papua New Guinea Regional
Total Language Processor Softwares
Transactional Licensing Program Softwares
Transmission Level Point Telecommunication

Posted on 04 Oct 2024, this text provides information on Business related to Miscellaneous in Business. Please note that while accuracy is prioritized, the data presented might not be entirely correct or up-to-date. This information is offered for general knowledge and informational purposes only, and should not be considered as a substitute for professional advice.

Take Quiz To Earn Credits!

Turn Your Knowledge into Earnings.

tuteehub_quiz

Tuteehub forum answer Answers

Post Answer

No matter what stage you're at in your education or career, TuteeHub will help you reach the next level that you're aiming for. Simply,Choose a subject/topic and get started in self-paced practice sessions to improve your knowledge and scores.