UNITS\;generated\;in\;T\;hours}}{{Maximum\;demand \times T}}\)The load factor may be daily load factor, monthly or annually if the period considered is a day or month or yearLoad factor is always LESS than 1 because the average load is SMALLER than the maximum demandIt plays a key role in DETERMINING the overall cost PER unit generated.Higher the load factor of the power station, the lesser will be the cost per unit generated, it is because a higher load factor means lesser maximum demandThe station capacity is so selected that it must meet the maximum demandNow, lower maximum demand means a lower capacity of the plant which reduces the cost of the plant

"> UNITS\;generated\;in\;T\;hours}}{{Maximum\;demand \times T}}\)The load factor may be daily load factor, monthly or annually if the period considered is a day or month or yearLoad factor is always LESS than 1 because the average load is SMALLER than the maximum demandIt plays a key role in DETERMINING the overall cost PER unit generated.Higher the load factor of the power station, the lesser will be the cost per unit generated, it is because a higher load factor means lesser maximum demandThe station capacity is so selected that it must meet the maximum demandNow, lower maximum demand means a lower capacity of the plant which reduces the cost of the plant

">

The ratio of average load to maximum demand in the power plant is defined as:

General Knowledge General Awareness in General Knowledge 7 months ago

  4   0   0   0   0 tuteeHUB earn credit +10 pts

5 Star Rating 1 Rating

Load factor: The ratio of average load to the maximum demand during a given period is known as the load factor.Load factor = average load/maximum demandIf the plant is in the operation for T hours\(Load\;factor = \frac{{Avearge\;load \times T}}{{Maximum\;demand \times T}}\)\(= \frac{{UNITS\;generated\;in\;T\;hours}}{{Maximum\;demand \times T}}\)The load factor may be daily load factor, monthly or annually if the period considered is a day or month or yearLoad factor is always LESS than 1 because the average load is SMALLER than the maximum demandIt plays a key role in DETERMINING the overall cost PER unit generated.Higher the load factor of the power station, the lesser will be the cost per unit generated, it is because a higher load factor means lesser maximum demandThe station capacity is so selected that it must meet the maximum demandNow, lower maximum demand means a lower capacity of the plant which reduces the cost of the plant

Posted on 02 Dec 2024, this text provides information on General Knowledge related to General Awareness in General Knowledge. Please note that while accuracy is prioritized, the data presented might not be entirely correct or up-to-date. This information is offered for general knowledge and informational purposes only, and should not be considered as a substitute for professional advice.

Take Quiz To Earn Credits!

Turn Your Knowledge into Earnings.

tuteehub_quiz

Tuteehub forum answer Answers

Post Answer

No matter what stage you're at in your education or career, TuteeHub will help you reach the next level that you're aiming for. Simply,Choose a subject/topic and get started in self-paced practice sessions to improve your knowledge and scores.